Connect with us

News

Akwa Ibom CJ frees 63 more inmates

Published

on

The Chief Judge of Akwa Ibom State, Ekaete Fabian F-Obot, has effected the release of 63 additional inmates from Uyo Custodial Centre, as she concluded her tour of correctional centres across the state.

The latest addition brings the number of freed inmates this year to 100, an unprecedented figure, having released 37 from Ikot Abasi, Eket and Ikot Ekpene custodian centres last week.

The release of the 63 inmates followed a careful review of their cases, including input from the Director of Public Prosecution, court clerks, and medical personnel within the correctional system.

A statement obtained from the judiciary press unit on Wednesday said 24 inmates out of the number were discharged on special grounds, while 39 were pardoned on compassionate grounds, including missing case files, trumped-up charges, and lack of diligent prosecution.

Among the special cases were 20 inmates suffering from serious health conditions, including one Godwin Francis Etim, who, battling tuberculosis, was referred to the Infectious Disease Hospital in Ikot Ekpene for treatment.

Also released to access special care was a pregnant inmate in her final trimester, facing medical complications beyond the facility’s capacity.

Another notable case was that of one Magdalene Bassey Edet, whose situation highlighted the importance of regular inspection.

According to the statement, she had been convicted by two different courts on separate charges arising from the same offence.

Having already completed a 10-year sentence, she was serving an additional two-year term for the same matter, having been convicted by another court while serving the 10-year term.

See also  Senate seeks support for farmers over farm produce price crash

In granting her release, the CJ acknowledged the report of her good conduct and placed her on probation for the remaining two years, requiring her to report every three months.

“Go and sin no more and don’t indulge in acts that will bring you back here,” the CJ warned.

Among those released on other grounds were four inmates whose cases could not proceed due to missing files, reportedly linked to the prolonged illness of a prosecutor absent for about three years.

Six others were found to have been wrongfully charged.

One such case involved Idara Christopher Kingsley, who had been detained in place of her husband after reporting a machete assault against her.

Her husband was wanted in connection with a fight involving family members, but she was arrested instead.

The chief judge urged all released inmates to maintain good conduct and refrain from returning to crime.

“I urge you all to maintain good conduct and not to indulge in criminal activities that will bring you back here,” the CJ added.

She criticised the practice by some police officers of obtaining remand orders and abandoning cases without returning to court after the stipulated 21 days.

She also advised magistrates to take proactive steps by fixing dates to strike out such cases and notify relevant parties, emphasising that cases should be struck out where there is a failure to follow due process.

Welcoming the CJ to the facility, the Officer in Charge, DCC Ezekiel Inyang, described the visit as timely, noting that the custodial centre was grappling with severe overcrowding.

See also  Update: Court adjourns Sowore’s arraignment on Cybercrime charges to October 27

He revealed that the facility, built in 1912, is significantly overstretched, with over 1,600 inmates.

He recounted the impact of a recent windstorm accompanied by heavy rainfall on Tuesday, February 17, which damaged three cell blocks and brought down part of the perimeter fence, plunging the facility into disarray.

He, however, said there were no casualties, nor were there escapees.

punch.ng

FOLLOW US ON:

FACEBOOK

TWITTER

PINTEREST

TIKTOK

YOUTUBE

LINKEDIN

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

News

Nigeria, US forces killled over 20 ISWAP fighters in fresh operation – DHQ

Published

on

The Defence Headquarters on Monday said Nigerian troops, in collaboration with the United States Africa Command, killed more than 20 Islamic State West Africa Province fighters during fresh coordinated air strikes in the North-East.

The DHQ said the operation was carried out in the general area of Metele following intelligence reports on the convergence and movement of terrorist elements within the region.

In a statement by the Director of Defence Information, Maj. Gen. Samaila Uba, the military said the strikes formed part of sustained operations aimed at dismantling terrorist networks and denying insurgents safe haven in the country.

“The Defence Headquarters, in close coordination with United States Africa Command, wish to update the general public on the continuation of coordinated operations against ISIS militants across the North East Nigeria, with additional air strike operations successfully executed in the general area of Metele.

“Following observed convergence and migration of terrorist elements, multiple air strikes were conducted resulting in the elimination of more than 20 ISIS/ISWAP fighters,” the statement partly read.

The military said the ongoing operations were designed to disrupt terrorist activities, remove fighters from the battlefield and prevent insurgents from regrouping.

“The Armed Forces of Nigeria will continue to aggressively defend the sovereignty, security and territorial integrity of the nation,” the statement added.

Uba stressed that terrorists threatening citizens and national stability would be located and defeated, saying that there would be no safe haven for all terrorists anywhere in Nigeria.

“Terrorists who threaten our citizens, communities and national stability will be located and defeated. There will be no safe haven for all terrorists anywhere in Nigeria,” he said.

See also  Senate confirms Amupitan as INEC chairman

This is coming after the announcements by United States President Donald Trump and President Bola Tinubu confirming the killing of ISIS kingpin, Al-Minuki during a joint counterterrorism operation conducted by Nigerian and US forces.

Trump described the slain militant as the most active terrorist in the world and claimed he was the second in command of ISIS globally,” adding that the terrorist leader believed he could evade capture in Africa.

punch.ng

FOLLOW US ON:

FACEBOOK

TWITTER

PINTEREST

TIKTOK

YOUTUBE

LINKEDIN

INSTAGRAM

Continue Reading

News

Bus knocks pedestrian dead in Ogun

Published

on

A pedestrian has lost his life after being knocked down by a Toyota Coaster bus at Imowo, along the Imowo-Ibadan Road inward Ijebu Ode in Ogun State.

PUNCH Metro gathered on Monday from the spokesperson for the Ogun State Traffic Compliance and Enforcement Agency, Babatunde Akinbiyi, that the fatal accident occurred at about 4:45 pm on Sunday and caused serious traffic congestion along the route due to the obstruction caused by the bus.

He noted that TRACE operatives and police officers from the Obalende Division were immediately deployed to the scene to manage traffic and rescue operations.

According to him, the accident happened when the pedestrian allegedly failed to check the other side of the road before attempting to cross.

The agency noted that there was a diversion to a single lane outward Ijebu Ode due to ongoing road rehabilitation works along the axis.

The statement read, “According to eyewitness account, the pedestrian forgot to check the other side of the road before crossing the road. There is diversion to one lane due to ongoing road rehabilitation on the axis.”

Akinbiyi added that no other injuries were recorded in the incident aside from the death of the male pedestrian.

He further disclosed that its operatives controlled vehicular movement around the scene to ease traffic congestion and prevent secondary accidents.

“TRACE operatives assisted in carrying the presumed dead into the OGSAS ambulance, while the body was subsequently conveyed to the General Hospital mortuary, Ijebu Ode,” the statement added.

The TRACE Head of Media stressed further that the accidented Toyota Coaster bus was later evacuated from the road and moved to the Police Area Command, Igbeba, for further investigation.

See also  New year crash: Over speeding driver kills 6, injures two on Lagos-Ibadan expressway (PHOTOS)

The agency confirmed that normal vehicular movement had been restored after the evacuation exercise.

PUNCH Metro reported earlier that an auto crash along the Third Mainland Bridge left a policeman riding on a motorcycle, dead after being hit by a Lexus car.

The driver of the car was said to have surrendered himself to the police following the incident.

Continue Reading

News

FG cracks down on unapproved contract variations in MDAs

Published

on

The Federal Government, through its Bureau of Public Procurement, on Sunday barred government Ministries, Departments, and Agencies from processing upward revisions of contract sums without first obtaining a Bureau certificate.

This was as it issued other sweeping guidelines that centralised the review of all contract variations and scope modifications under its authority. According to a statement signed by its Head of Press and Public Relations, Zira Nagga, the Bureau said the reform is designed to close one of the most persistent channels for cost inflation and corruption in Nigeria’s public procurement system.

The guidelines, issued pursuant to Sections 5(a) and (o) of the Public Procurement Act 2007, give effect to a Federal Executive Council-approved policy conveyed by the Secretary to the Government of the Federation in December 2025.

The statement is titled ‘Contract Variations: BPP Releases Guidelines.’

The new guidelines replace an earlier 2013 framework that required Presidential approval only for variations above 15 per cent of the initial contract sum or N1bn.

Under the new framework, every request for a variation order, fluctuation claim, or scope modification, regardless of size, must first be submitted to the BPP for review and certification before proceeding to the relevant approving authority.

Nagga noted that a BPP Certificate of No Objection, valid for six months, is now a mandatory precondition for any further action. Variations processed without it will attract sanctions under the Public Procurement Act 2007, including suspension of responsible officers and debarment of contractors, the statement said.

It also quoted the Bureau’s Director-General, Adebowale Adedokun, as saying, “Variations must not become a backdoor for cost inflation and scope creep.

See also  Kebbi gov signs N642.9bn 2026 budget into law

“These guidelines ensure that every adjustment to a public contract is necessary, justified, and delivers value to Nigerians. The BPP will apply these rules rigorously and fairly across all MDAs.”

Accordingly, the guidelines draw a firm line between permissible and impermissible grounds for variation. Acceptable grounds include unforeseen site conditions, material errors in design or bills of quantities, statutory changes after contract execution, significant price escalation due to macroeconomic shocks or force majeure, and value engineering improvements that reduce cost without altering scope.

Variations arising from inadequate planning, avoidable design flaws, or the addition of new components not contemplated in the original contract scope will be rejected outright, Nagga noted.

Such additions, the guidelines stated, must be procured as entirely separate contracts, a provision aimed at blocking the practice of using variations to effectively award new projects under the cover of an existing contract.

On fluctuation claims, adjustments for changes in the cost of labour, materials, and exchange rates, the guidelines introduced new deterrents against deliberate project delays.

It stated that, going forward, contractors found to have intentionally slowed down execution in order to generate larger fluctuation claims will be denied those claims and may be debarred if the claims are found to be bogus or overstated.

The revised approving authority thresholds are now tied to the augmentation sum, the amount of the increase, rather than the total revised contract cost. Works variations of N10bn and above will require Federal Executive Council approval.

It stated, “Those between N5bn and N10bn go to the Ministerial Tenders Board; those between N75m and N5bn to the Parastatal Tenders Board; and anything below N75m for works, or N50m for goods and services, can be approved at the Accounting Officer level.”

See also  Federal High Court debunks report of ass@ssination attempt on Justice Omotosho after Nnamdi Kanu's life sentence

Similar thresholds apply to goods and services procurement. To address the upstream cause of many avoidable variations, the guidelines mandated the use of approved final designs for all procurements from the outset.

It also stated that the use of preliminary or flawed designs that subsequently generate unnecessary variations will attract regulatory sanctions, a provision targeting the entrenched practice of commencing projects with incomplete engineering designs.

On transparency, the BPP said all MDAs are required to publish details of every approved variation, including the contractor’s name, original contract sum, augmentation amount, revised contract sum, and grounds for the increase, on their websites and the BPP portal within 30 days of Tenders Board approval.

The BPP said it will also periodically submit council notes to the Federal Executive Council on reviewed and approved variations across government. The guidelines take immediate effect and apply to all ongoing projects regardless of when the original contract was awarded.

punch.ng

FOLLOW US ON:

FACEBOOK

TWITTER

PINTEREST

TIKTOK

YOUTUBE

LINKEDIN

INSTAGRAM

Continue Reading

Trending